Anfield
Plain - Northern Construction Solutions Limited
The Greenhouse, Anfield Plain
| Project |
: |
Foundations, drainage, floor slabs, retaining wall and building
work |
| Client |
: |
Mowlem PLC |
| Value |
: |
£325,000 |
| Duration |
: |
24 weeks |
This project was a design & construct contract for Northern Construction
Solutions’ client and involved close and open cooperation in order
to determine and develop the detailed scope of works whilst balancing
that against the budget allowances and programme constraints.
Northern Construction Solutions limited were given responsibility for
delivering the following work packages:
- reinforced concrete foundations
- foul & surface water drainage installation
- underground geothermal slinky pipe installation & associated chambers
- power floated reinforced concrete floor slab (1700m²)
- PCC retaining wall installation and reinforced concrete box culvert
and headwalls to the lake
- substation building
- service trench & duct installation, including street lighting
In addition, Northern Construction Solutions constructed a 9m
x 9m x 2.5m heavily reinforced concrete base incorporating the precision
alignment and incorporation of a steel wind turbine housing shaft. The
base was completed in a single pour.
By working closely with the client to fully understand the project’s
inherent challenges Northern Construction Solutions were able
to successfully handover a high quality project, on time, to budget and
without any safety incidents.
|