Gliderol
- Floor Slab - Northern Construction Solutions Limited
Gliderol Doors, Peterlee
| Project |
: |
Factory floor and office slab |
| Client |
: |
Interserve Project Services |
| Value |
: |
£80,000 |
| Duration |
: |
2 weeks |

The contract required Northern Construction Solutions to construct a
factory floor and office slab as part of a new production facility for
Gliderol Doors.
The area of the slab was over 4000m² and consisted of slab depths
varying from 150mm to 250mm. The thicker slabs were reinforced with mesh
in the top and bottom with the remainder having one layer in the bottom.
Close cooperation with Interserve and some innovative ideas with control
joint layouts enabled us to produce a scheme which kept the number of
slab pours to a minimum but optimised the accuracy of the finished levels.
Over 700m³ of fibre mesh concrete was pumped into position and finished
to the required tolerances using a combination of vibrating rolling beams,
hand held vibrating “Magic Screeds” and lasers.
|