Walton
Street - Northern Construction Solutions Limited
West Park and Walton Street Improvements
| Project |
: |
Design and construction of improved park and car park amenities |
| Client |
: |
Kingston upon Hull City Council |
| Value |
: |
£600,000 |
| Duration |
: |
15 weeks |
Following the opening of the Hull Stadium, improvements were required
to the surrounding park facilities and adjacent car park; many of these
were undertaken by Northern Construction Solutions in this contract.
The basis was full design and construct, taking the outline proposals
and producing from them fully designed solutions for each element of work,
which included:
- Upgrading of 50,000m² car park; replacing grassed areas with
stone and gravelled surfaces and installing new drains
- Trimming and tarmac surfacing stadium access road 600m long; soiling
and seeding verges
- Replacing 300m park road with new surfaced road.
- Demolition of existing aviaries and creation of new formal ornamental
gardens, including decorative paving, mosaics, lighting, street furniture
and planting.
- Traffic calming and other safety measures to park roads
- Creation of landscape bunds within the park
|